WingSet19Ann
After dinner, I cut the 16 pieces of bid (4 each for 4 reinforcements) and four pieces of peel ply. Scuff sanded the fuselage where the layups would go. Mixed a decent size batch of epoxy and made the four layups on poly and placed them on the fuselage. Covered them with the peel ply.
|
Full size:
640x480
|