|
|
IMG_0229
At Steve's workshop packing the kit ready for transportation
Date: 01/31/2014
Views: 52381
|
|
|
IMG_0279
Insulation going in
Date: 04/02/2014
Views: 51493
|
|
|
|
IMG_0187[1]
Started to fit fixtures and fittings
Date: 04/13/2014
Views: 50210
|
|
|
IMG_0189[1]
Date: 04/13/2014
Views: 49538
|
|
|
|
IMG_0187.JPG (2)
Workshop kitted out. All done in 3 weeks!
Date: 04/13/2014
Views: 48036
|
|
|
IMG_0190[1]
Date: 04/13/2014
Views: 46650
|
|
|
|
Ipad 044
Shed Complete
Date: 04/13/2014
Views: 44542
|
|
|
DSC00153
Lathe installed
Date: 09/01/2015
Views: 41622
|
|
|
|
Ipad 039
Concrete base for 20ft x 10ft shed
Date: 03/22/2014
Views: 41031
|
|
|
Ipad 041
Shed Under construction
Date: 03/27/2014
Views: 41013
|
|
|
|
Torque tube
Took some measurements and sent query to Europa. Response was I required the issue 1 TP38s
Date: 09/03/2015
Views: 37256
|
|
|
IMG_0191[1]
Date: 09/12/2015
Views: 36059
|
|
|
|
DSC00149
Winch installed in garage
Date: 09/01/2015
Views: 36022
|
|
|
Rivets
Next problem. Once the push rod end was fitted and drilled according to the manual the rivets provided were too short to go through the whole structure. Awaiting a response from Europa
Date: 09/03/2015
Views: 35325
|
|
|
|
DSC00155
As you can see the Issue 1 Bearings are considerably longer and will require shortening once I have the correct dimensions.
Date: 09/03/2015
Views: 32706
|
|
|
IMG_0821
Trial fitted the torque tube but it looks like the TP38 bearing is too short!
Date: 09/03/2015
Views: 30637
|
|
|
|
IMG_0344[1]
Aircraft parts & Documents stored
Date: 09/04/2014
Views: 30575
|
|
|
IMG_0823
Same of port side.
Date: 09/03/2015
Views: 27229
|
|
|
|
IMG_0404
Date: 04/17/2015
Views: 25238
|
|
|
IMG_0410
Date: 04/17/2015
Views: 24050
|
|