Rough River 2010 notes on long wing spar strengthening.
Date: 09/21/2010
Views: 3961
Newest Image
EAA SITE
Date: 08/23/2023
Views: 819128
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 819128
Battery Switch operation.
"Basically the controls are just by my left wrist in
the left seat, spring-loaded to go aft. Aft is OFF. The control knobs sit in
slots, and will spring aft if not in the Power-On slot (or if the cable
snaps, etc.) The cables snake aft to the Switch Board which holds the
switches in the ‘fuselage behind the second bulkhead – see above), The
switches take the battery(s) power and deliver to the firewall port side via
1/2inch copper pipe with CCA#4 cable. I hope that makes it a bit clearer –
sorry for all the Mbits."
Y10-02-14