Login
EuropaOwners Recent Updates Battery Switch operation.
Advanced Search
View Slideshow (Fullscreen)

Recent Updates

1. Battery... 2. Battery... 3. Battery... 4. Battery...

Random Images

DSCN4800Ann

DSCN4800Ann

Date: 10/22/2006 Views: 4439

Rudder_stops_4

Rudder_stops_4

Date: 05/26/2009 Views: 5487

DSCF0075

DSCF0075

Date: 10/26/2009 Views: 10016

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693424

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693424

Battery Switch operation.

Battery Switch operation.
"Basically the controls are just by my left wrist in
the left seat, spring-loaded to go aft. Aft is OFF. The control knobs sit in
slots, and will spring aft if not in the Power-On slot (or if the cable
snaps, etc.) The cables snake aft to the Switch Board which holds the
switches in the ‘fuselage behind the second bulkhead – see above), The
switches take the battery(s) power and deliver to the firewall port side via
1/2inch copper pipe with CCA#4 cable. I hope that makes it a bit clearer –
sorry for all the Mbits."
Y10-02-14

Date: 02/22/2010
Full size: 465x640
nextlast
first previous
Battery Switch operation.
nextlast
first previous
Powered by Gallery v2.3