Login
EuropaOwners Random Items Port headrest conduit 2.
Advanced Search
View Slideshow (Fullscreen)

Random Items

1. Gear_Indica... 2. Time to... 3. Same shot... 4. Old gear... 5. Port... 6. Brackets... 7. Revised... 8. Port... ... 48. Port...

Random Images

Bernidino pass Switzerland

Bernidino pass Switzerland

Date: 08/17/2011 Views: 6155

Dolly 10

Dolly 10

Date: 02/14/2014 Views: 21927

PortWingWiring09Ann

PortWingWiring09Ann

Date: 10/01/2005 Views: 4119

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 772533

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 772533

Port headrest conduit 2.

We needed to modify the hole saw to accomplish the task of installing the conduit.
First thing was to grind off the weld bead on the aft side of the hole saw. You can see the weld ground off on the prior pict.
I used a belt sander to begin with, then proceeded to use a grindstone and finished off with the belt sander.
Then my extra long 1/4" drill bit became not so long. We needed to harvest a piece of 1/4" drill rod with no flutes on it. After cutting the shank off with the grind stone and smoothing both ends, I ground a flat on the portion that aligns with the setscrew.
Y10-08-21

Date: 08/20/2010
Size:
Full size: 2592x1944
nextlast
first previous
Port headrest conduit 2.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/2.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 1/30 sec Date/Time Sat 21 Aug 2010 01:15:25 AM UTC
nextlast
first previous
Powered by Gallery v2.3