Magnetic oil plug check and 5 year rubber part replacement 3
Date: 08/19/2010
Views: 5636
High_finals_Prestwick_Scotland_EGPK
Date: 08/29/2008
Views: 6911
First pass 5
Date: 08/03/2013
Views: 7250
Newest Image
EAA SITE
Date: 08/23/2023
Views: 797190
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 797190
Door sill conduit run 16.
This is starboard side conduit being installed.
First we made a green masking tape hinge holding conduit in precise location but allowing us to open up and wet out 5 inches of lower seam, (above front lift pin strengthening).
Then we wet out seam with Aeropoxy / 30 minute, floxed and here we are installing 2 plies of thin model aeroplane cloth 1.50" x 5".
Y10-08-12