Bonding port front spacer to fuse with JB KWIK weld.
Date: 10/12/2009
Views: 6119
dscn0316
Date: 12/31/1969
Views: 4117
Newest Image
EAA SITE
Date: 08/23/2023
Views: 771212
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 771212
Aft sill cover 9.
3 BID starboard with Aeropoxy / 60 minute.
BID was applied 1 ply first, then 2 plies. Plastic was used to wet out and apply BID. 2 plies are 1/4" shorter than the first on the wood.
There is no tape on wood because this 3 BID layup is an extension and we wanted it to bond. It will also get 1 BID on the inside surface.
Y10-08-31