Date: 03/02/2009 Views: 5869
Date: 05/21/2009 Views: 8560
Date: 09/16/2007 Views: 12918
Date: 08/23/2023 Views: 771819
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09