Date: 10/12/2010 Views: 8264
Date: 12/31/1969 Views: 18465
Date: 11/29/1999 Views: 7152
Date: 08/23/2023 Views: 841124
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09