Login
EuropaOwners Recent Updates Tie-bar 10.
Advanced Search
View Slideshow (Fullscreen)

Recent Updates

1. Fit baggage... ... 154. Tie-bar 7. 155. Tie-bar 8. 156. Tie-bar 9. 157. Tie-bar 10. 158. Tie-bar 11. 159. Fred... 160. Fred... ... 400. JB KWIK...

Random Images

Before closing E-bus switch, open Alternator switch first.

Before closing E-bus switch, open Alternator switch first.

Date: 03/01/2011 Views: 3640

Ruddder_1

Ruddder_1

Date: 05/21/2009 Views: 6332

SA_006_dwg

SA_006_dwg

Date: 10/02/2008 Views: 6559

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 793500

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 793500

Tie-bar 10.

Tie-bar bolted in position, two Perma-Grit files, (taped with 3m 375 packaging tape), inserted and sprung apart with mixing sticks.
After we got things looking like we wanted them, Alan put some JB KWIK on the mixing sticks to hold them in place.
We got a nice squeeze out of Q-Cel from all around.
Y10-11-11

Date: 11/10/2010
Size:
Full size: 1900x1425
nextlast
first previous
Tie-bar 10.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/2.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Thu 11 Nov 2010 01:28:18 AM UTC
nextlast
first previous
Powered by Gallery v2.3