Before closing E-bus switch, open Alternator switch first.
Date: 03/01/2011
Views: 3640
Ruddder_1
Date: 05/21/2009
Views: 6332
SA_006_dwg
Date: 10/02/2008
Views: 6559
Newest Image
EAA SITE
Date: 08/23/2023
Views: 793500
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 793500
Tie-bar 10.
Tie-bar bolted in position, two Perma-Grit files, (taped with 3m 375 packaging tape), inserted and sprung apart with mixing sticks.
After we got things looking like we wanted them, Alan put some JB KWIK on the mixing sticks to hold them in place.
We got a nice squeeze out of Q-Cel from all around.
Y10-11-11