Date: 09/23/2007 Views: 5328
Date: 12/31/1969 Views: 3558
Date: 06/24/2006 Views: 4280
Date: 08/23/2023 Views: 725229
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.