Date: 12/31/1969 Views: 4546
Date: 06/28/2008 Views: 5445
Date: 06/06/2003 Views: 5384
Date: 08/23/2023 Views: 793435
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.