Login
EuropaOwners Recent Updates Front HardPoint 8
Advanced Search
View Slideshow (Fullscreen)

Recent Updates

1. ALFRED... ... 13. Front... 14. Front... 15. Front... 16. Front... 17. Front... 18. Front... 19. Front... ... 293. Gear latch ...

Random Images

Door mechanism cover install 6.

Door mechanism cover install 6.

Date: 11/14/2010 Views: 9006

IMG_2327

IMG_2327

Date: 07/10/2005 Views: 5113

IMGA0620

IMGA0620

Date: 04/09/2013 Views: 68260

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693391

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693391

Front HardPoint 8

Fit is now good enough, will work on tapering the front side to match the tunnel (with 2 BID behind it).

Y13-12-27

Update Y13-12-29:
Sculpted the front and back side to fit tunnel pretty nicely, then scuff sanded with 80 grit, washed with very hot water and Palmolive, wet out with Aeropoxy, then filled holes with a dry mix of Aeropoxy/Q-cel.
Didn't add very much weight at all. Q-Cel is a lot harder to sand compared with Expancel, but think it's probably a bit stronger.
After cure of Q-Cel on insert (and sanding things flat), floxed corners of tunnel, and 2 BID +2.25" all around, then floxed in place the insert (~ 1/16" all over) and after squeegeeing off excess flox, 2 BID +2.00" all around and over the insert, then Peel Plied.

Date: 12/27/2013
Size:
Full size: 4896x3672
nextlast
first previous
Front HardPoint 8

Photo Properties

summary  details
Make SONY Model DSC-HX20V
Aperture Value f/3.2 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash No Flash Focal Length 4.45 mm
ISO 250 Metering Mode Multi-Segment
Shutter Speed Value 1/30 sec Date/Time Fri 27 Dec 2013 01:18:45 AM UTC
nextlast
first previous
Powered by Gallery v2.3