|
|
Straight ahead
Date: 11/27/2013
Views: 7949
|
|
|
Mill round slot in master cylinder 3 of 12
Date: 12/23/2013
Views: 9255
|
|
|
|
Mill round slot in master cylinder 1 of 12
Date: 12/23/2013
Views: 7430
|
|
|
Now you can see lightening holes onthe small offsetting plate
Date: 11/28/2013
Views: 7681
|
|
|
|
Flap extension 22
Date: 11/22/2013
Views: 8943
|
|
|
Made spacer a few thousands shorter than the pillow block hole
Date: 11/29/2013
Views: 7496
|
|
|
|
1/2" clamps that allow cable to slide 2 of 2
Date: 12/16/2013
Views: 9985
|
|
|
Flap cross tube slot tube 3
Date: 08/04/2013
Views: 7204
|
|
|
|
Emergency Maneuver that starts with Heim? 10 of 13
Date: 12/16/2013
Views: 7564
|
|
|
Length of coupler is ~ .855" cut down from 1". 9.5 times two is 19, so this allows minimum of 19 threads of engagement
Date: 12/13/2013
Views: 6371
|
|
|
|
Flap extension 14
Date: 11/07/2013
Views: 8960
|
|
|
First pass 6
Date: 08/03/2013
Views: 7739
|
|
|
|
Nice-a-fit!
Date: 11/27/2013
Views: 6891
|
|
|
Flap cross tube marking tool
Date: 08/04/2013
Views: 7113
|
|
|
|
Emergency Maneuver that starts with Heim? 9 of 13
Date: 12/16/2013
Views: 7822
|
|
|
Rod end clevis fork ground down to 1.975" (again minimum 9.5 threads of engagement)
Date: 12/13/2013
Views: 8570
|
|
|
|
Front HardPoint 3
Date: 12/27/2013
Views: 9842
|
|
|
Kingsley 2 19mm Sealed bearing on side of suspension trailing arm.
Date: 09/04/2005
Views: 6914
|
|
|
|
Front Cable Mount with Lever in Down Position
Date: 12/12/2013
Views: 7342
|
|
|
Temporary mount using 1 flat head 1/4-28
Date: 12/13/2013
Views: 7227
|
|