Date: 07/11/2009 Views: 9897
Date: 03/07/2010 Views: 5838
Date: 07/27/2009 Views: 6200
Date: 08/23/2023 Views: 771750
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09