Date: 02/03/2009 Views: 2823
Date: 12/31/1969 Views: 2540
Date: 11/01/2007 Views: 6544
Date: 08/23/2023 Views: 144496
Date: 05/23/2007 Views: 549759
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09