Date: 05/13/2009 Views: 7813
Date: 06/08/2007 Views: 6281
Date: 03/02/2009 Views: 5218
Date: 08/23/2023 Views: 771732
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09