Date: 06/22/2009 Views: 4337
Date: 06/08/2010 Views: 7288
Date: 04/19/2007 Views: 5890
Date: 08/23/2023 Views: 857694
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09