Date: 11/04/2009 Views: 5396
Date: 07/10/2005 Views: 5349
Date: 02/04/2009 Views: 4250
Date: 08/23/2023 Views: 771940
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09