CG evaluation will likely be needed after we complete wiring!
Date: 03/18/2009
Views: 4354
IMG_5901post
Date: 08/09/2009
Views: 5229
IMG_1420
Date: 05/31/2011
Views: 5580
Newest Image
EAA SITE
Date: 08/23/2023
Views: 725273
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 725273
Tie-bar 8.
I built up the OD of the tie-bar with Duct tape to simulate 2 BID under the tie-bar, 1 wrap of Redux / BID and allowance for Redux / Flox.
Then stapled in place a piece of Peel ply.
I think I built up the OD by .060".
Y10-11-11