Date: 12/31/1969 Views: 11198
Date: 01/22/2006 Views: 4030
Date: 07/02/2012 Views: 5605
Date: 08/23/2023 Views: 704677
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.