Date: 03/25/2004 Views: 5762
Date: 04/15/2009 Views: 5614
Date: 11/28/2007 Views: 5911
Date: 08/23/2023 Views: 704674
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.