Vertical upright, swing-arm and generator install 3 of 7.
Date: 08/12/2003
Views: 9016
DSC_0058
Date: 08/31/2007
Views: 4693
Newest Image
EAA SITE
Date: 08/23/2023
Views: 704674
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 704674
Tie-bar 20.
This piece of duct tape was used to cover the hole in the tunnel when doing the 2 BID layup.
Both Alan and I made notes to remove.
Note that Alan wrote in red magic marker under the 3m 375 tape so during the layup the red didn't transfer.
Y10-11-14