Login
EuropaOwners Most Viewed Items Aft fuse conduit run 14.
Advanced Search
View Slideshow (Fullscreen)

Most Viewed Items

1. Aft fuse... ... 19. Aft fuse... 20. Aft fuse... 21. Aft fuse... 22. Aft fuse... 23. Aft fuse... 24. Aft fuse... 25. Aft fuse...

Random Images

IMG_1668_001

IMG_1668_001

Date: 06/23/2004 Views: 5048

IMG_0127

IMG_0127

Date: 12/02/2006 Views: 4476

Paul's conduit 1.

Paul's conduit 1.

Date: 07/27/2010 Views: 4817

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693399

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693399

Aft fuse conduit run 14.

Peel ply applied on port side.
The starboard side was peel plied with only 3 piece of peel ply.
There was a little air that got between mold and glass. this side we tried using 6" pieces of peel ply.
It worked a little better IMHO. This one had a mini uniform air bubble at joint of foam to fuse, where the starboard side was not uniform and created mini bumps.
Y10-08-20

Date: 08/20/2010
Size:
Full size: 2592x1944
nextlast
first previous
Aft fuse conduit run 14.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/2.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Fri 20 Aug 2010 03:43:24 AM UTC
nextlast
first previous
Powered by Gallery v2.3