Login
EuropaOwners Random Items Upright reinforced joints 2 of 2.
Advanced Search
View Slideshow (Fullscreen)

Random Images

DSCN3928

DSCN3928

Date: 09/30/2005 Views: 5775

IMG_6307post

IMG_6307post

Date: 08/09/2009 Views: 5213

IMG_0230

IMG_0230

Date: 02/12/2006 Views: 5263

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693421

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693421

Upright reinforced joints 2 of 2.

2) Apply glue to the contact areas of these two 2 x 3 reinforcements.

4) Using four 3" Sheetrock screws each for each upright joint reinforcement drill 4 clearance holes. Two each side of the vertical uprights and two in each of the reinforcement 2 x 3s. Then drill pilot holes for the screws. It's best if you do only one at a time. Drill only one clearance and one pilot hole at a time, then install and tighten that screw, then go onto the next.

This exercise will reward you with strong and stiff uprights.

Once the glue is dried or cured, you can back off the pivot screws to the point that gravity will move the swing-arm.

Y11-09-17

Date: 08/12/2003
Size:
Full size: 4048x3040
Upright reinforced joints 2 of 2.

Photo Properties

summary  details
Make FUJIFILM Model FinePix S7000
Aperture Value f/4 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash No Flash Focal Length 14 mm
ISO 200 Metering Mode Multi-Segment
Shutter Speed Value 1/240 sec Date/Time Tue 12 Aug 2003 05:40:14 PM UTC
Powered by Gallery v2.3