Rigidize/size/atize top center of instrument module 2.
Date: 02/11/2010
Views: 6979
DSCN6499
Date: 10/25/2009
Views: 5132
A062403_Two_5
Date: 12/31/1969
Views: 5301
Newest Image
EAA SITE
Date: 08/23/2023
Views: 704538
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 704538
dsc08634
OK now that the plane is off the trailer and on its own wheel we were able to remove most of the trailer hardware and position the ribs. We also used the main bolts to hold the first rib in place. The other rib was left a little lower to be located once the plane was back on the trailer. I never wanted an air ratchet more than while working on the trailer with all the bolts.
OK now that the plane is off the trailer and on its own wheel we were able to remove most of the trailer hardware and position the ribs. We also used the main bolts to hold the first rib in place. The other rib was left a little lower to be located once the plane was back on the trailer. I never wanted an air ratchet more than while working on the trailer with all the bolts.