Second and final pass of Port top wingskin bond on 8.
Date: 09/13/2010
Views: 3103
Newest Image
EAA SITE
Date: 08/23/2023
Views: 182496
Door sill conduit run 16.
This is starboard side conduit being installed.
First we made a green masking tape hinge holding conduit in precise location but allowing us to open up and wet out 5 inches of lower seam, (above front lift pin strengthening).
Then we wet out seam with Aeropoxy / 30 minute, floxed and here we are installing 2 plies of thin model aeroplane cloth 1.50" x 5".
Y10-08-12