Date: 09/16/2007 Views: 2764
Date: 12/16/2006 Views: 3237
Date: 03/03/2007 Views: 3924
Date: 08/23/2023 Views: 119396
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.