Marked area to be cut out after stabalizing with 4 more rivets.
Date: 07/19/2010
Views: 2985
Newest Image
EAA SITE
Date: 08/23/2023
Views: 160009
nex_2014_01_25_01
Starboard side after Uni over ribs 3 and 4. Added Bid on the X to reinforce the cuts needed to get the Uni to lay flat. Also filled in Rib 1 air buble.
Starboard side after Uni over ribs 3 and 4. Added Bid on the X to reinforce the cuts needed to get the Uni to lay flat. Also filled in Rib 1 air buble.