Date: 11/10/2010 Views: 3259
Date: 11/29/1999 Views: 3690
Date: 05/26/2009 Views: 4119
Date: 08/23/2023 Views: 151626
Date: 05/23/2007 Views: 554984
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.