Date: 11/10/2010 Views: 3224
Date: 12/31/1969 Views: 2875
Date: 06/07/2004 Views: 3489
Date: 08/23/2023 Views: 144446
Date: 05/23/2007 Views: 549737
Mixed up a batch of epoxy and applied two plies of BID over the inside of the guides to the fuselage. The port fore bolt-shoot guide bonded with Araldite and with 2 plies of BID laid up over.