Date: 11/29/1999 Views: 4006
Date: 10/17/2013 Views: 4793
Date: 04/07/2006 Views: 3387
Date: 08/23/2023 Views: 216115
Date: 05/23/2007 Views: 585281
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.