Date: 08/09/2009 Views: 3087
Date: 10/08/2006 Views: 3413
Date: 12/31/1999 Views: 2639
Date: 08/23/2023 Views: 148413
Date: 05/23/2007 Views: 553202
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.