Date: 10/11/2009 Views: 3226
Date: 01/08/2004 Views: 2983
Date: 12/31/1969 Views: 2626
Date: 08/23/2023 Views: 115649
Date: 05/23/2007 Views: 541480
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.