Air-brake cables were used to determine feasibility and length needed
Date: 11/27/2013
Views: 4650
OK, we are ready for in situation fitting to get correct length and angle of 1" tube
Date: 11/27/2013
Views: 3564
IM002773
Date: 10/30/2007
Views: 4464
Newest Image
EAA SITE
Date: 08/23/2023
Views: 175169
Fuse post bond 1.
Vertical fin rib got some foam dug out and a fillet of Redux/flox then peel ply. Hard job to not push too much flox through to the other side that would at best be difficult to remove. This joint will get 2 BID.
Y9-05-03