Date: 12/31/1969 Views: 2504
Date: 12/31/1969 Views: 2940
Date: 02/20/2010 Views: 3627
Date: 08/23/2023 Views: 96143
Pumps get wired, heat shrink labeled and capacitors installed. Terminals needed to be drilled for metric as did phospher bronze star washers. Y9-03-22