Date: 12/31/1969 Views: 3580
Date: 04/15/2006 Views: 3280
Date: 03/12/2012 Views: 5493
Date: 08/23/2023 Views: 85366
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.