|
|
CH16_3
Date: 12/31/1969
Views: 5929
|
|
|
nex_2014_01_25_04
Bill helping hoist the aircraft up to remove the jig.
Date: 01/25/2014
Views: 20248
|
|
|
|
050302_aft_socket
Date: 12/31/1999
Views: 4337
|
|
|
P1010151
Date: 11/29/1999
Views: 6842
|
|
|
|
IMG_0840post
And now we have brakes again. Doesn't sound like much, but that's about an hour and a half since arriving at the airport. Pulled the aircraft back out, climbed in, strapped up and went through the start up check list. Turned the radios on and checked w
Date: 01/22/2010
Views: 4819
|
|
|
Trying not to mar flap cross tube too bad with Upstops 3 of 7
Date: 12/26/2013
Views: 11763
|
|
|
|
IMG_0127
Date: 12/02/2006
Views: 4813
|
|
|
Firewall02
Date: 03/05/2004
Views: 4173
|
|
|
|
DSCN6501
Date: 10/25/2009
Views: 5091
|
|
|
Ron and Alan took turns working on starboard bracket.
Date: 01/20/2010
Views: 7688
|
|
|
|
Foam rope plugs
Date: 10/06/2010
Views: 40131
|
|
|
BrakeLineRout05Ann
Date: 06/15/2004
Views: 3499
|
|
|
|
MG_2874
Date: 03/17/2008
Views: 6344
|
|
|
Axle caps 2 of 3.
Date: 08/06/2003
Views: 7598
|
|
|
|
DSCF0006
Date: 02/15/2009
Views: 6974
|
|
|
063002_doorpistonbase
Date: 12/31/1969
Views: 3698
|
|
|
|
CH28_05
Date: 07/03/2006
Views: 5402
|
|
|
IMG_1564
Date: 06/07/2004
Views: 5134
|
|
|
|
DSC_0054
Date: 08/31/2007
Views: 5193
|
|
|
DSCN5552Ann
Date: 02/18/2007
Views: 4517
|
|