|
|
DSCN6197Ann
Date: 07/04/2007
Views: 5424
|
|
|
IMG_2467
Date: 02/07/2006
Views: 5380
|
|
|
|
Fuse fill 4.
Date: 05/21/2009
Views: 4700
|
|
|
Flap drive pin install 5.
Date: 11/30/2010
Views: 7815
|
|
|
|
Photo0011
Date: 10/12/2009
Views: 7181
|
|
|
26112006030_G
Date: 11/26/2006
Views: 5588
|
|
|
|
Nose 2.
Date: 04/02/2009
Views: 6791
|
|
|
wingtipltswiring3
Date: 12/28/2006
Views: 6803
|
|
|
|
MG_1691
Date: 07/09/2006
Views: 4807
|
|
|
IMG_9571post
The fuel lines were tied with tie-wraps and 1/2" (12.7 mm) rubber fuel hose lengths. The vent hose was tied in as well by running it through short lengths of fuel hose and using tie-wraps to hold the rubber hose and protect the vent line from chafin
Date: 06/12/2010
Views: 6405
|
|
|
|
DoorSupportMod48Ann
Date: 02/12/2006
Views: 3597
|
|
|
DSCF0003
Date: 07/15/2009
Views: 4500
|
|
|
|
AileronCloseout10
Date: 11/29/1999
Views: 4468
|
|
|
Autopilot_06
Date: 05/19/2008
Views: 5318
|
|
|
|
DSCN5341
Date: 07/10/2009
Views: 7733
|
|
|
Glacier_Alps_2003
Date: 12/31/1969
Views: 4617
|
|
|
|
IMG_0834post
2010 01 22 - Did a preflight in the hanger. Pulled the aircraft out, climbed in, strapped up and began the start check list. Got to set brake and the brake handle came all the way back. No brakes again.
Date: 01/22/2010
Views: 5010
|
|
|
Airbrake Terry 1.
Date: 09/01/2010
Views: 3321
|
|
|
|
dscn0411
Date: 12/31/1969
Views: 4742
|
|
|
CH8P_7
Date: 12/31/1969
Views: 6593
|
|