|
|
dsc09022
Here you see I used bondo on the shims and screwed them down into the block. The shims made sure the guide was level. Also note the hole drilled in the Aluminum angle and the shim. This is where I fixed the guide for the curing stage to ensure nothing
Date: 01/22/2013
Views: 21063
|
|
|
IMG_0212post
Date: 09/09/2010
Views: 3514
|
|
|
|
IMG_2461
The two main panels cut, poked and in place.
Date: 10/27/2011
Views: 9681
|
|
|
DSCN5440Ann
Date: 12/31/2006
Views: 16155
|
|
|
|
060202_Rigged4
Date: 12/31/1969
Views: 3631
|
|
|
DSCF0764
Date: 08/03/2003
Views: 5638
|
|
|
|
050502_safty
Date: 12/31/1969
Views: 3762
|
|
|
UC_Handle_Rebate
Date: 09/02/2004
Views: 6878
|
|
|
|
DSCN5721
Date: 11/29/1999
Views: 4477
|
|
|
DoorMount52Ann
Date: 08/17/2004
Views: 3504
|
|
|
|
19april09_010_1
Date: 04/19/2009
Views: 5270
|
|
|
DSC_0259
Date: 05/15/2008
Views: 5117
|
|
|
|
A062903_FirstFlight3
Date: 12/31/1969
Views: 3866
|
|
|
p1000719
p1000719.jpg
Date: 03/12/2012
Views: 11512
|
|
|
|
img0213copy
Date: 07/29/2007
Views: 4655
|
|
|
Alternate static and total Energy switches.
Date: 04/18/2009
Views: 7352
|
|
|
|
Here's my extra deflection
Date: 11/27/2013
Views: 6365
|
|
|
DSCF0075
Date: 04/02/2009
Views: 3589
|
|
|
|
IMG_6626annpost
Date: 09/24/2009
Views: 5140
|
|
|
Neckbrace complete 1.
Date: 04/14/2009
Views: 8147
|
|