|
052302_firewall
Date: 12/31/1969
Views: 3341
|
|
|
IMG_2916Ann
Date: 01/02/2009
Views: 3865
|
|
|
DSCN6621
Date: 10/25/2009
Views: 2630
|
|
|
44_G
Date: 06/19/2009
Views: 3098
|
|
|
DeathValley2
DeathValley
Date: 02/15/2010
Views: 3890
|
|
|
Ruudde_8
Date: 05/31/2009
Views: 3564
|
|
|
MG_1708
Date: 07/09/2006
Views: 3190
|
|
|
DSCF0023
Date: 06/19/2009
Views: 3229
|
|
|
IMG_0002_001
Date: 04/14/2007
Views: 4153
|
|
|
bb1
Date: 01/05/2009
Views: 3158
|
|
|
dsc08636
Here is Bill placing in some 2x6's to act as a support for the rear rib. The I-beam is 3 inches wide so the 2x6 fit perfectly. I'll explain later how those come into play.
Date: 04/15/2012
Views: 7140
|
|
|
Ipad 041
Shed Under construction
Date: 03/27/2014
Views: 9223
|
|
|
Pneu. tube abraision resistance 3.
Date: 06/08/2010
Views: 3363
|
|
|
CH8_7
Date: 12/31/1969
Views: 4448
|
|
|
IMAG0219
Date: 10/17/2012
Views: 7609
|
|
|
IMG_7383ann
The Issue, Continued... The blue Tee connector shown has a 3/8 NPT thread on the upper leg. it is a 3/8 x 24 National Pipe Thread. That is, it has a tapered thread. The thread measures 0.373 in on the narrow end and 0.408 in on the wide end. The othe
Date: 03/07/2010
Views: 2942
|
|
|
Vertex_ant_5
Date: 03/15/2009
Views: 3405
|
|
|
dscn0866
Date: 12/31/1969
Views: 2394
|
|
|
Tie-bar 76.
Date: 11/29/2010
Views: 4953
|
|
|
Front fuse conduit run 23.
Date: 09/14/2010
Views: 3604
|
|