|
|
Gearbox tear down 2
Date: 08/19/2010
Views: 3539
|
|
|
U5
Date: 10/26/2008
Views: 7605
|
|
|
|
dsc08634
OK now that the plane is off the trailer and on its own wheel we were able to remove most of the trailer hardware and position the ribs. We also used the main bolts to hold the first rib in place. The other rib was left a little lower to be located once
Date: 04/15/2012
Views: 20512
|
|
|
IMG_1708
Date: 07/06/2004
Views: 5838
|
|
|
|
108_0831_IMG
Date: 10/15/2003
Views: 7451
|
|
|
Port half opened.
Date: 10/08/2009
Views: 5202
|
|
|
|
web02
Date: 12/10/2005
Views: 4454
|
|
|
A062403_Two_7
Date: 12/31/1969
Views: 4329
|
|
|
|
010323_006
Date: 12/31/1969
Views: 4786
|
|
|
IMG_7875Ann
Date: 06/25/2008
Views: 5702
|
|
|
|
Front Cable Mount with Lever in Down Position
Date: 12/12/2013
Views: 7573
|
|
|
dscn0405
Date: 12/31/1969
Views: 4898
|
|
|
|
22112003200347_G
Date: 12/31/1969
Views: 4270
|
|
|
IMG_6367Ann
Date: 12/11/2007
Views: 5348
|
|
|
|
Starboard_door_crack_1_Y9_06_07
Date: 06/07/2009
Views: 4979
|
|
|
IMG_6708Ann
Date: 02/16/2008
Views: 4211
|
|
|
|
101602_Cliff
Date: 12/31/1969
Views: 3715
|
|
|
IMG_5896post
Date: 08/09/2009
Views: 6687
|
|
|
|
IMG_7029
Supporting material in the form of rigid polyurethane sheet and micro/epoxy mix are laid out on the bottom of the fuselage.
Date: 10/31/2013
Views: 9391
|
|
|
IMG_5230ann
Date: 06/13/2009
Views: 6282
|
|