|
DSCF0021_1
Date: 10/26/2009
Views: 4721
|
|
|
Top fit 5.
Date: 04/05/2009
Views: 5095
|
|
|
Liftpin sockets bonded in place!
Date: 10/31/2010
Views: 5813
|
|
|
2005_DSCF0120
Date: 02/04/2009
Views: 3746
|
|
|
IMG_2363
Date: 08/07/2005
Views: 4387
|
|
|
DSC_0146
Date: 09/21/2007
Views: 5025
|
|
|
IMG_8060Ann
Date: 07/05/2008
Views: 4543
|
|
|
FlapDrive09Ann
Date: 08/09/2004
Views: 2932
|
|
|
IMG_7906Ann
Date: 06/27/2008
Views: 3996
|
|
|
GJ7I2392
Date: 07/09/2006
Views: 4204
|
|
|
Battery cutoff switches 2.
Date: 02/22/2010
Views: 5633
|
|
|
DSC_0103
Date: 09/21/2007
Views: 3897
|
|
|
Door hinge rebates 44.
Date: 11/10/2009
Views: 4887
|
|
|
Wiring22Ann
Date: 09/17/2004
Views: 3390
|
|
|
dscn1968
Date: 12/31/1969
Views: 4162
|
|
|
CH19_12
Date: 12/31/1969
Views: 4092
|
|
|
IMG_2239
Date: 05/30/2016
Views: 35654
|
|
|
DSC02837
Date: 12/31/1969
Views: 5151
|
|
|
IMG_0425
Date: 09/24/2005
Views: 5912
|
|
|
Aluminum Plenum flanges installed
Aluminum flanges were added to the plenums so that the plenums would not need to be fastened directly to the hot heads. Later in the build, the pop rivets were replaced with machine screws so that the front 2/3 of the plenum could be easily removed
Date: 01/01/2011
Views: 154995
|
|