|
|
4_snaps
Old snap base installation with the new snap base.
Date: 06/23/2011
Views: 4926
|
|
|
DoorMount04Ann
Date: 07/03/2004
Views: 4556
|
|
|
|
Bonding shoot bolt bushings 4.
Date: 11/05/2010
Views: 6581
|
|
|
DSCF0022
Date: 06/28/2009
Views: 4853
|
|
|
|
IMG_9569post
A side view of the installation. Tomorrow I'll be trying to complete the installation of the new control column mounted brake master cylinder. If that is done and I have working brakes, we may try an engine run.
Date: 06/12/2010
Views: 6897
|
|
|
16Fairing_Stbd_flap_section_laid_up
Date: 12/31/1969
Views: 6409
|
|
|
|
img0740copy
Date: 07/29/2007
Views: 3708
|
|
|
DSC_0216
Date: 05/15/2008
Views: 4842
|
|
|
|
IM001206
Date: 10/30/2007
Views: 8404
|
|
|
108_0803_IMG
Date: 10/07/2003
Views: 8448
|
|
|
|
MDO_Aircraft_P1
Date: 10/18/2009
Views: 10354
|
|
|
ODYSSEY PC545 our choice for primary battery.
Date: 01/01/2009
Views: 6923
|
|
|
|
WingSetC04Ann
Date: 08/09/2004
Views: 4501
|
|
|
DSCF0065
Date: 02/14/2009
Views: 5280
|
|
|
|
DSCF0020_001
Date: 09/08/2009
Views: 5822
|
|
|
IMG_2157
Date: 12/20/2004
Views: 5922
|
|
|
|
TrimRelayDeck06Ann
Date: 09/27/2004
Views: 6631
|
|
|
DSCN8179
Date: 09/18/2010
Views: 9232
|
|
|
|
IMG_2460
Used our hydraulic punch to poke out the round holes. The rectangular holes were corner drilled and cut out with aircraft shears. Files were used to clean up the holes in shape and size.
Date: 10/27/2011
Views: 11021
|
|
|
DSC_0203
Date: 05/15/2008
Views: 5404
|
|