|
DSCN5135
Date: 11/29/1999
Views: 3443
|
|
|
DSCF0024
Date: 08/03/2009
Views: 2586
|
|
|
04122002203301_G
Date: 12/31/1969
Views: 2451
|
|
|
IMG_0261Ann
Date: 04/23/2008
Views: 3237
|
|
|
dsc08634
OK now that the plane is off the trailer and on its own wheel we were able to remove most of the trailer hardware and position the ribs. We also used the main bolts to hold the first rib in place. The other rib was left a little lower to be located once
Date: 04/15/2012
Views: 6521
|
|
|
DSCF0700
Date: 08/02/2003
Views: 3509
|
|
|
IMG_1446ann
Final brake plumbing and other stuff installed below the tunnel.
Date: 06/04/2011
Views: 2533
|
|
|
IMG_2467
Date: 02/07/2006
Views: 2779
|
|
|
IMG_2026
Date: 08/18/2009
Views: 3322
|
|
|
2005oct08_02
Date: 12/31/1999
Views: 5299
|
|
|
DSCF0036
Date: 03/02/2009
Views: 2964
|
|
|
IMG_2428Ann
Date: 11/09/2008
Views: 2630
|
|
|
DSCN6155Ann
Date: 06/18/2007
Views: 3127
|
|
|
Front fuse conduit run 7.
Date: 09/07/2010
Views: 3861
|
|
|
24_04_08_vliegfoto_s_050
Date: 04/26/2008
Views: 2101
|
|
|
IMG_5724ann
Date: 07/25/2009
Views: 2869
|
|
|
Archer_6_antenna_install_10
Date: 01/23/2009
Views: 3646
|
|
|
P1010604
Date: 11/29/1999
Views: 2944
|
|
|
IMG_7962Ann
Date: 06/29/2008
Views: 2740
|
|
|
LX-CWT Mod 51 alternative 2
Date: 07/15/2010
Views: 4133
|
|