|
|
IMG_0837post
Back up to the top and refill the master cylinder. About 2 cc's needed.
Date: 01/22/2010
Views: 5600
|
|
|
083102_flap_faining
Date: 12/31/1969
Views: 4173
|
|
|
|
p1000634
p1000634.jpg
Date: 02/14/2012
Views: 12031
|
|
|
N4211W wing rigging 15.
Date: 10/09/2010
Views: 5804
|
|
|
|
IMG_2258
Date: 02/23/2005
Views: 6644
|
|
|
P3180003
Date: 03/18/2006
Views: 6745
|
|
|
|
051202_flaptube
Date: 12/31/1969
Views: 5032
|
|
|
Flugzeugabsturz_22_08_2008_Marchtrenk_012
Date: 08/22/2008
Views: 7420
|
|
|
|
01052003204321_G
Date: 12/31/1969
Views: 6855
|
|
|
DSCN8346
Date: 09/19/2010
Views: 5663
|
|
|
|
Web_Site_06
Date: 03/25/2004
Views: 5771
|
|
|
DSCN3966
Date: 09/30/2005
Views: 4680
|
|
|
|
IMG_0138post
Date: 09/03/2010
Views: 4309
|
|
|
21082003203651_G
Date: 12/31/1969
Views: 4221
|
|
|
|
107_0779_IMG
Date: 10/03/2003
Views: 7410
|
|
|
Rivets
Next problem. Once the push rod end was fitted and drilled according to the manual the rivets provided were too short to go through the whole structure. Awaiting a response from Europa
Date: 09/03/2015
Views: 32503
|
|
|
|
Tailplane_46
Date: 01/23/2006
Views: 3643
|
|
|
Panel_16
Date: 01/23/2006
Views: 4830
|
|
|
|
IMG_0727
Date: 11/02/2005
Views: 4247
|
|
|
Sanding out port bottom spar ripple.
Date: 10/05/2009
Views: 4943
|
|