|
|
DSCN4006
Date: 10/31/2005
Views: 5996
|
|
|
DSCN8352
Date: 09/19/2010
Views: 7293
|
|
|
|
DSC_0230
Date: 05/15/2008
Views: 5316
|
|
|
15052002111430_G
Date: 12/31/1969
Views: 3922
|
|
|
|
Aluminum Plenum flanges installed
Aluminum flanges were added to the plenums so that the plenums would not need to be fastened directly to the hot heads. Later in the build, the pop rivets were replaced with machine screws so that the front 2/3 of the plenum could be easily removed
Date: 01/01/2011
Views: 193354
|
|
|
instument_panel
Date: 08/16/2008
Views: 7173
|
|
|
|
Option C) Electrical Box install 2 of 3.
Date: 08/12/2003
Views: 10240
|
|
|
IMG_7798Ann
Date: 06/21/2008
Views: 5360
|
|
|
|
DSCN3559
Date: 12/31/1969
Views: 4123
|
|
|
Control_Systems_1_001
Date: 05/19/2008
Views: 6067
|
|
|
|
DSC00085
Date: 12/31/1969
Views: 6724
|
|
|
Camera clamp 1.
Date: 03/25/2009
Views: 8088
|
|
|
|
FuelLinesx4Ann
Date: 04/23/2006
Views: 4714
|
|
|
Smooth rigging 2.
Date: 10/25/2010
Views: 5629
|
|
|
|
Single point ground 4.
Date: 04/18/2009
Views: 7793
|
|
|
French Homebuilt.1
French Homebuilt1
Date: 07/02/2005
Views: 6353
|
|
|
|
IM002969
Date: 10/30/2007
Views: 6983
|
|
|
smDSCN1785
Date: 12/31/1969
Views: 8030
|
|
|
|
DSCN6191Ann
Date: 07/01/2007
Views: 8381
|
|
|
DSCF0023
Date: 02/14/2009
Views: 6055
|
|