After layup was complete, peel plied.
Date: 08/31/2009
Views: 4292
|
|
|
IMG_8079Ann
Date: 07/06/2008
Views: 4751
|
|
|
Generator harness install 2 of 2.
Date: 08/12/2003
Views: 7063
|
|
|
MOV00266
Date: 04/13/2009
Views: 4639
|
|
|
Flap_Motor_Installation_08
Date: 11/27/2007
Views: 4725
|
|
|
IMG_0028post
Date: 08/30/2010
Views: 4620
|
|
|
Schematic done, Art gets right to it!
Date: 03/13/2009
Views: 9123
|
|
|
24_04_08_vliegfoto_s_027
Date: 04/26/2008
Views: 3672
|
|
|
Top bond on 10.
Date: 04/30/2009
Views: 4673
|
|
|
DSCN4716Ann
Date: 09/03/2006
Views: 4261
|
|
|
Fred fairing install 14.
Date: 07/06/2008
Views: 5876
|
|
|
DSCN6296
Date: 10/11/2009
Views: 3842
|
|
|
Control_Systems_65_19
Date: 06/03/2007
Views: 4356
|
|
|
010702_counter_boring_tool
Date: 12/31/1969
Views: 3805
|
|
|
imm033_34
Date: 09/02/2009
Views: 5322
|
|
|
IMG_2528
View from the other side. Must have down 5 test fit by the last one. Each resulted in finding things to correct. So I've been correcting things for a couple weeks now. More wire labels, adding connectors, checking pinouts, testing switches, finding is
Date: 01/14/2012
Views: 5225
|
|
|
Stephen dolly 2.
Date: 05/15/2008
Views: 5342
|
|
|
Tail_Wheel_Install_14
Date: 02/04/2009
Views: 4110
|
|
|
Making awful fit of lift pads correct 16.
Date: 10/12/2010
Views: 4668
|
|
|
IMG_1932
Date: 10/24/2004
Views: 4675
|
|