|
|
Revised schematic adressing prop 3.
Date: 06/08/2010
Views: 7531
|
|
|
IMG_1255ann
The superfluous pump and plumbing removed. In addition, I connected the flaps to the electrical power source for the main pump (not shown). This provides power to the flaps through the old pump circuit breaker path. Tested and it works fine.
Date: 03/25/2011
Views: 4382
|
|
|
|
IMG_1199
Date: 10/28/2009
Views: 8328
|
|
|
Wing fairing may interfere trailer and glider
Date: 11/23/2010
Views: 4045
|
|
|
|
Kunzleman_combo_system_2
Date: 02/10/2009
Views: 4267
|
|
|
2006SnF046
Date: 04/07/2006
Views: 5636
|
|
|
|
DSCN5130
Date: 11/29/1999
Views: 6221
|
|
|
24_04_08_vliegfoto_s_053
Date: 04/26/2008
Views: 3300
|
|
|
|
Bb1
Date: 02/01/2009
Views: 6283
|
|
|
Mod65_3
Date: 12/31/1969
Views: 4542
|
|
|
|
DSCF0017_002
Date: 08/18/2009
Views: 4346
|
|
|
Flettner strip
Date: 01/26/2010
Views: 8081
|
|
|
|
IMG_6793post
Length of the main square beam
Date: 12/10/2009
Views: 5649
|
|
|
DSCF0067
Date: 10/27/2009
Views: 8335
|
|
|
|
EISConnAann
Date: 05/28/2004
Views: 4019
|
|
|
24_04_08_vliegfoto_s_072
Date: 04/26/2008
Views: 3623
|
|
|
|
IMG_0281post
Date: 08/11/2009
Views: 6058
|
|
|
2005_DSCF0100_3_1
Date: 02/04/2009
Views: 4740
|
|
|
|
P1010154
Date: 11/29/1999
Views: 6120
|
|
|
Front Starboard fuse stiffening for lift socket 5.
Date: 10/24/2010
Views: 6802
|
|