|
Vertex handheld antenna being inserted in tube 1.
Date: 01/25/2010
Views: 6005
|
|
|
P9010197
Date: 09/01/2007
Views: 12184
|
|
|
Ruudde_9
Date: 05/31/2009
Views: 4960
|
|
|
082002_window_bonded
Date: 12/31/1969
Views: 3626
|
|
|
DSC_0268
Date: 05/15/2008
Views: 5265
|
|
|
DSCF0020_1
Date: 07/02/2009
Views: 4176
|
|
|
DSCF0025
Date: 04/02/2009
Views: 5173
|
|
|
IMG_0280
Date: 04/16/2005
Views: 4145
|
|
|
Cobra_head_front
Front view of cobra head modification. A vane was added to help smooth flow of air into the carb. The vane runs the length of the cobra head and extends about 1 inch into the carburetor throat. It seems to have helped even out the CHTs and EGSs between
Date: 11/05/2011
Views: 145812
|
|
|
IMG_0123
Date: 01/10/2007
Views: 4001
|
|
|
Rubberprop1
Date: 10/25/2009
Views: 5663
|
|
|
122_2231_IMG
Date: 01/27/2005
Views: 5377
|
|
|
Left_base_runway_19_Oxford_EGTK
Date: 07/25/2009
Views: 4445
|
|
|
55_G
Date: 06/19/2009
Views: 4015
|
|
|
IMG_2386_001
Date: 08/14/2005
Views: 10860
|
|
|
IMG_7773Ann
Date: 06/14/2008
Views: 3563
|
|
|
Flap rigging.
Date: 09/23/2006
Views: 67315
|
|
|
DSC_0208
Date: 05/15/2008
Views: 4491
|
|
|
oh_xjo_ivl16
Date: 07/26/2007
Views: 4270
|
|
|
Vallidolid_Spain_Canary_trip
Date: 09/19/2006
Views: 5762
|
|