|
|
piper2
Date: 12/31/1969
Views: 26487
|
|
|
Second and final pass of Port top wingskin bond on 9.
Date: 09/13/2010
Views: 4605
|
|
|
|
IMG_1321
Continuing to fit wheel pants and gear leg fairings. Boring pics so we'll stick with interesting pics. Had to do a reinforcement layup in the wing root to cover the hole needed to access the pitot/static plumbing. That's six plies alternating at 45º.
Date: 04/19/2011
Views: 5811
|
|
|
WingSet86Ann
Date: 08/03/2004
Views: 3586
|
|
|
|
Emergency Maneuver that starts with Heim? 1 of 13
Date: 12/16/2013
Views: 8337
|
|
|
DSCN4733Ann
Date: 09/24/2006
Views: 6729
|
|
|
|
DSCN4826Ann
Date: 11/26/2006
Views: 4855
|
|
|
StbdWingInspectHole01
Date: 10/17/2003
Views: 5685
|
|
|
|
082602_topcover2
Date: 12/31/1969
Views: 3570
|
|
|
WingSet60Ann
Date: 07/28/2004
Views: 3477
|
|
|
|
DSC_0044
Date: 02/04/2009
Views: 10179
|
|
|
dscn1098
Date: 12/31/1969
Views: 4891
|
|
|
|
DSCF0098
Date: 06/22/2009
Views: 6590
|
|
|
Battery cutoff switches 2.
Date: 02/18/2010
Views: 5032
|
|
|
|
Panel population 7.
Date: 03/01/2010
Views: 5933
|
|
|
Door sill conduit run 19.
Date: 08/11/2010
Views: 5795
|
|
|
|
Cockpit_Module_11
Date: 01/23/2006
Views: 5758
|
|
|
DSC_0035
Date: 08/31/2007
Views: 6499
|
|
|
|
Fred 6.
Date: 06/04/2009
Views: 5459
|
|
|
P1001032
Date: 10/31/2008
Views: 9467
|
|