|
|
Nose complete 4. Y10-01-07
Date: 01/06/2010
Views: 19167
|
|
|
Panel population 7.
Date: 03/01/2010
Views: 6066
|
|
|
|
2005oct08_15
Date: 11/09/2005
Views: 7233
|
|
|
DSCN5576Ann
Date: 02/25/2007
Views: 4579
|
|
|
|
Cu13
Date: 01/02/2009
Views: 6375
|
|
|
A062403_Two_1
Date: 12/31/1969
Views: 4307
|
|
|
|
IMG_2217Ann
Date: 09/19/2008
Views: 4588
|
|
|
Pre-made harness 5.
Date: 03/26/2009
Views: 7146
|
|
|
|
After module mounted with a few screws measured warp gap.
Date: 01/14/2010
Views: 6605
|
|
|
IMG_1675
Date: 06/24/2004
Views: 6399
|
|
|
|
InstrumentPanel69Ann
Date: 10/04/2004
Views: 4818
|
|
|
Scandinavia_672
Date: 06/13/2004
Views: 5777
|
|
|
|
011202_too_much_washout
Date: 12/31/1969
Views: 3776
|
|
|
Control_Systems_66
Date: 01/23/2006
Views: 4621
|
|
|
|
Flap extension 14
Date: 11/07/2013
Views: 9548
|
|
|
IMG_6794post
Starting point for the measurement of the main square beam. Also shows where the tailwheel "U" channel begins.
Date: 12/10/2009
Views: 8743
|
|
|
|
Trailer at Lydd for first flight
Unloading aircraft from trailer at Lydd
Date: 05/14/2008
Views: 38535
|
|
|
IMG_7393
Shot bags (25 lbs each) to hold the top in place for the final bonding. 2 plies of fiberglass over a micro filler in the cut.
Date: 03/01/2014
Views: 10763
|
|
|
|
Wrap_with_peel_ply
Date: 10/29/2007
Views: 6791
|
|
|
Vertex_ant_19
Date: 03/15/2009
Views: 6978
|
|