|
|
09022003163249_G
Date: 12/31/1969
Views: 4005
|
|
|
IM003603
Date: 11/24/2007
Views: 8753
|
|
|
|
30122002193223_G
Date: 12/31/1969
Views: 5227
|
|
|
Oshkosh_2009_023
Date: 07/27/2009
Views: 9943
|
|
|
|
Front fuse conduit run 8.
Date: 09/07/2010
Views: 9132
|
|
|
IMG_2446
Date: 12/23/2005
Views: 6064
|
|
|
|
IMG_6391Ann
Date: 12/11/2007
Views: 5535
|
|
|
IMG_0946Ann
Date: 08/01/2007
Views: 5997
|
|
|
|
100_0085_IMG_2
Date: 04/06/2006
Views: 5070
|
|
|
Pneu. tube abraision resistance 6.
Date: 06/10/2010
Views: 5949
|
|
|
|
This is the gap at high point on port door.
Date: 10/15/2009
Views: 5572
|
|
|
DSCN6646
Date: 10/25/2009
Views: 5904
|
|
|
|
CBM - ANNEX E(T)1
Date: 11/18/2013
Views: 4767
|
|
|
IMG_7029
Supporting material in the form of rigid polyurethane sheet and micro/epoxy mix are laid out on the bottom of the fuselage.
Date: 10/31/2013
Views: 9772
|
|
|
|
Rollbar_mockup
Date: 10/29/2007
Views: 7897
|
|
|
Lower cover needs fill.
Date: 01/06/2010
Views: 11553
|
|
|
|
InstrumentPanel42Ann
Date: 06/05/2004
Views: 3279
|
|
|
IMG_7022Ann
Date: 03/15/2008
Views: 5424
|
|
|
|
IMG_7030
The tank was then put in place so that the urethane and micro could shape themselves to the bottom of the tank
Date: 10/31/2013
Views: 9869
|
|
|
DSCN5425Ann
Date: 12/29/2006
Views: 5145
|
|